BESTWAY TECHNOLOGIES LOGO

+91 - 9000567126, +91 - 9848686581

[email protected]

Testing Tools


 

Automation Training Topics

   1)   INTRODUCTION
   2)  ADVANTAGES AND DISADVANTAGES
   3)   TYPES OF AUTOMATION TOOLS

  1. Functional Tool (QTP)
  2. Performance Tool

   4)  INTRODUCTION AND OVERVIEW OF QTP
    5)  PARTS OF QTP

  • Test Pane
  • i.            Keyword View
  • ii.            Expert View
  • Active Screen
  •                                        i.            Recording and Running
  • Normal Recording
  • Analog Recording
  • Low Level Recording
  •                                     ii.            Object Repository
  • Types of Object Repository
    • Local
    • Shared
    • Navigation for creating a shared repository
    • Navigation for associating a shared repository
    • Navigation for updating a shared repository
    • Navigation for adding the objects into objects repository
    • Highlighting in Application
    • Locate in Repository
  •                                   iii.            Object Identification
  • Properties
  • Types of Ordinal Identifier
  •                                   iv.            Object Spy
  • Types of Objects
  •                                      v.            QTP Life Cycle
  • Test Planning
  • Generating the Basic Test
  • Enhancing the Test
  1. Check Points
  • Web Checkpoint
  • Accessibility Checkpoint
  • Standard Checkpoint
  • Bit Map Check Point
  • Text Check Point
  • Text area Check Point
  • Database Check Point
  • XML Check Point
  1.  Synchronization
  2.  Data driven Testing
  3.  Parameterization
  • Debugging the Test
  1.  Debugging
  2.  Breakpoint
  3.  Step Commands
  • Step in to
  • Step Over
  • Run to Step
  • Debug for Step
  • Executing the Test
  • Analyzing the Test 
  1. Data Table
  • Inserting the Output values and Types
  1. Debug Viewer Pane
  2. Information Pane
  3. Missing Resources Pane
  • Batch Testing

6.      RECOVERY SCENARIO
7.      ENVIRONMENT VARIABLES

  • Built in Variables
  • User Defined Variables

8.      METHODS WITH REAL TIME SCENARIOS

  • Capture bit Map
  • Exist Method

9.      INPUT OUTPUT PARAMETRS
10. VIRTUAL OBJECT CONFIGURATION
11. DATA TABLE METHODS
12. AOM
13. DATABASE CONNECTIONS
14. DESCRIPTIVE PROGRAMMING

  1. Advantages And Disadvantages

 

MANUAL TESTING TRAINING TOPICS

1.      INTRODUCTION

  1. Why Should we Choose Testing?
  2. Who can do Testing?
  3. What is Project and Product?
  4. What is Quality?
  5. What is testing?

2.      BIDDING THE PROJECT

  1. Kick off meeting
  2. PIN

3.   SDLC (SOFTWARE DEVELOPMENT LIFE CYCLE)

  1. Initial Phase
  • i.  Template
  • ii.Prototype
  • Analysis Phase
  • i.  Feasibility Study
  • ii.Tentative Planning
  • iii.      Technology Selection and Environment Confirmation
  • iv.     Requirement  Analysis
  1. Design Phase
  • i.       HLD
  • ii.    LLD
  • iii.   Pseudo Code
  1. Coding Phase
    1. i.         Coding
    2. ii.       Unit Testing
    3. Testing Phase
    4. Delivery and Maintenance Phase

4.      QUALITY CONTROL(CONVENTIONAL) AND QUALITY ASSURANCE (UNCONVENTIONAL)TESTING

5.      TESTING METHODS

  • Black Box Testing
  • White Box Testing
  • Gray Box Testing

6.      LEVELS OF TESTING

  1. Unit Level Testing
  2. Module Level Testing
  3. Integration Level  Testing
  • TDA
    • STUB
    • BUA
      • DRIVER
      • Hybrid
      • Bigbang
  1. System Level  Testing
  2. UAT Level Testing

7.     ENVIRONMENT

          • Types of Environment
        1. i.         Standalone Environment
        2. ii.       Client Environment
        3. iii.      Web Environment
        4. iv.     Distributed Environment

8.SOFTWARE DEVELOPMENT MODELS

        1. Agile Model
        2. V Model
        3. waterfall Model
        4. Prototype Model
        5. Evolutionary Model
        6. Fish Model
        7. Spiral Model
  1. 9.      TYPES OF TESTING
  2. Sanity Testing
    1. RegressionTesting
    2. Re-Testing
    3. µ Testing
    4. β Testing
    5. Static Testing
    6. Dynamic Testing
    7. InstallationTesting
    8. Usability Testing
    9. Compatibility Testing
    10. Monkey Testing
    11. Exploratory Testing
    12. Port- Testing
    13. End to End Testing
    14. Reliability Testing
    15. Security Testing
    16. Mutation Testing
    17. Adhoc Testing

10. STLC (Software TESTING Life Cycle)

  1. Test Planning
  • Contents of Test Planning
    • 1.0 Introduction
    • 1.1 Objective
    • 1.2 Reference Document
    • 2.0 Coverage of Testing
    • 2.1 Features to be Tested
    • 2.2 Features not to be Tested
    • 3.0 Test Strategy
    • 3.1 Levels of Testing
    • 3.2 Types of Testing
    • 3.3 Test Design Techniques
    • 4.0 Base Criteria
    • 4.1 Acceptance Criteria
    • 4.2 Suspension Criteria
    • 5.0 Test Deliverables
    • 6.0 Test Environment
    • 7.0 Resource Planning
    • 8.0 Scheduling
    • 9.0 Staffing and Training
    • 10.0 Risks and Contingence
    • 11.0 Assumptions
    • 12.0 Approval Information
  1. Test Development
  • Use case Template
    • Special Requirements
    • Functional Requirements
    • Types of Test cases
    • traceability Matrix
  1. Test Execution
  2. Result Analysis
  3. Bug tracking
  • Types of Defects
    • Seviority
    • Priority
    • Bug Life Cycle
  1. Reporting
  • i.            Classical Bug Reporting Process
  • ii.            Common Repository Oriented Bug Reporting Process
  • iii.            Bug Tracking  Tool

11. TERMINOLOGY

  1. Defect Product
  2. Defective Product
  3. Quality Assurance
  4. Quality Control
  5. NCR
  6. Inspection
  7. Audit
  8. CAPA
  9. SCM
  10. Common Repository
  11. Check-in and Checkout
  12.  Baseline
  13. Publishing
  14. Delivery
  15. SRN
  16. SDN
  17. Review and Review Report
  18. Peer Review and Peer Review Report
  19. Test Suit
  20. Test Bed
  21. Defect Age
  22. Latent Defect
  23. Slippage
  24. Acceleration
  25. Metrics
  26. traceability Matrix
  27. Prototype
  28. Template
  29. Bench mark
  30. Change Request
  31. Impact Analysis
  32. Walk Through
  33. Code Walk Through
  34. Code Optimization
  35. PPM
  36. PPR

 Performance Testing Training Topics

 1.      INTRODUCTION

2.      TYPES OF PERFORMANCE TESTING

  1. Load Testing
  2. Features Performance Testing
  3. Stress Testing

3.      INTRODUCTION AND ADVANTAGES OF LOAD RUNNER
4.      ARCHITECTURE OF LOAD RUNNER

  1. Virtual User Generators
  2. LR Controller
  3. LR Agent Process
  4. LR Agent
  5. Analysis

5.      Load Runner Life Cycle

  1. Load Test Planning
  2. Creating the Task using Virtual user generator
  • i.            Virtual User in-it
  • ii.            Action
  • iii.            Virtual User End
  • iv.            Enhancing The Test
  • Transaction Points
  • Rendezvous Point
  • Break Point
  • Comment
  • Think Time
  • v.            Check Points
  • Text Check Point
  • Image Check Point
  • vi.            Parameterization
  1. Designing the Scenario
  2. Executing the Scenario
    1. e.      Analyzing the Result

Quality Center

1.      INTRODUCTION
2.      ARCHITECTURE OF QUALITY CENTER

  1. Site Administrator
  2. Quality Center
  • i.   Business Components
  • ii.   Requirements
  • iii.   Test Plan
  • iv.   Test Lab
  • v.   Defects
  • vi.   Dash Board

ETL TESTING WITH MSBI TOOL

 

  • Request Demo